All rails
Verified · Nov 20, 2026Instant retailTurkey

FAST — Instant and Continuous Transfer of Funds (Türkiye)

Türkiye's instant payment system, launched on 8 January 2021. From 26 August 2026 FAST transfers and Request-to-Pay payments are capped at TRY 300,000, up from TRY 100,000. A World Bank case study says non-bank PSPs meeting the criteria can join directly, though the CBRT's own participation page is older.

Operator: Central Bank of the Republic of Türkiye (CBRT)

Launched
8 January 2021
Limit (from 26 Aug 2026)
TRY 300,000 per transaction for transfers, Request-to-Pay and merchant QR
Previous limits
TRY 100,000 (transfers, Request-to-Pay); TRY 250,000 (QR)
Daily limit
None set by the CBRT per a secondary summary

Overview

How this rail works

CBRT Press Release 2026-36 of 24 August 2026 raises FAST limits to TRY 300,000 from 26 August: money transfers and payments through the Request-to-Pay overlay from TRY 100,000, and dynamic-verification merchant QR payments from TRY 250,000. It does not say which participants the change applies to. The World Bank case study says the CBRT allows direct participation by banks and by non-bank PSPs that meet technical and operational criteria, and fintech.tr says payment and e-money institutions have joined directly since 2023; the CBRT's own page, which says non-bank participation would be evaluated after June 2021, is out of date on this. The same summary says the CBRT sets no daily limit, though banks and payment institutions may apply lower daily or per-channel limits. We did not read the CBRT participant list.

Access

Ways to get connected

Simplified from the operator's and regulators' published material — not legal advice. Scheme admission is ultimately a decision for the operator.

Direct participant — bank

Who

Banks operating in Türkiye.

What it takes

CBRT participation and technical criteria.

Direct participant — payment or e-money institution

Who

Non-bank PSPs meeting the criteria (World Bank; fintech.tr).

What it takes

CBRT licence under Law 6493 and the technical and operational criteria; the current rule text was not read.

Licences

The licences that unlock it

Access to a rail normally starts with authorisation under one of these regimes.

Documents

Scheme documents

3 publicly available documents, linking out to the operator's or regulator's own original — we don't rehost PDFs.

Sources

Where this came from

Researched Nov 20, 2026. Scheme rules and access criteria change — check the operator directly for the latest.